Sunshine Boys

Report

Reported By: Patrick Dyson
Reported on: 02 Dec 2022
Issue: Placement
Bolt Number: Anchors
Severity:   2  
Description: The rock behind and to the right of these anchors has fallen and eroded. I think they should be moved down to the top of the climb which would eliminate the topout but be a lot more stable
Bolt Type: Stud Bolt and Hanger
Bolt Diameter: 3/8"
Hanger Type: SS Modern Hanger
Hanger Brand: Metolius
Before