Developer/Admin Updates
Updated By: |
[email protected] @ 31 Oct 2022 |
Installed Date: |
2021-11-11 |
Installed By: |
Adam |
Funded By: |
TCC |
Reviewed Name: |
[email protected] |
Reviewed Date: |
2022-09-28 |
Sug. Next Review: |
2032-09-28 |
Suggested Action: |
Monitor |
Admin Notes
Adam rebolted whole route with SS glue-ins. Removed QL on lower carabiner and attached it directly to bolt to avoid double clipping (9/28/22). After public griping added ss chain, quicklinks, and a mussy to level the clips (10/30/22). Noticed old bolt that was patched has been cored out and 5/8" hole (seen in after image)